DEFINITION
Preferred Schedule

The initial schedule produced by a Scheduling Coordinator that represents its preferred mix of generation to meet demand. The schedule includes the quantity of output (generators) and consumption (loads), details of any adjustment bids, and the location of each generator and load. The schedule also specifies the quantities and location of trades between the Scheduling Coordinator and all other Scheduling Coordinators, and is balanced with respect to generation, transmission losses, load, and trades.

Loading conversations.
Similar or Related Terms
Statistics
430
Characters
73
Words
21.43
Flesch Reading Ease
16.3
Flesch Kincaid Grade