FK Reading Ease
50.7

FK Grade Level
High School
  • Flag
  • FK Reading Ease
    64.9

    FK Grade Level
    Middle School
  • Flag
  • Campus: Two or more Federal facilities located on one site and typically sharing some aspects of the environment, such as parking, courtyards, private vehicle access roads, or gates and entrances to connected buildings. A campus may also be referred to as a “Federal center” or "complex."

    FK Reading Ease
    34.5

    FK Grade Level
    College
  • Flag
  • Agriculture, mining, and construction (consumer category): Companies engaged in agriculture, mining (other than coal mining), or construction industries.
    FK Reading Ease
    -8.8

    FK Grade Level
    Graduate School
  • Flag
  • Building shell (envelope) DSM program: A DSM program that promotes reduction of energy consumption through improvements to the building envelope. Includes installations of insulation, weather stripping, caulking, window film, and window replacement.
    FK Reading Ease
    24

    FK Grade Level
    College
  • Flag
  • Building shell conservation feature: A building feature designed to reduce energy loss or gain through the shell or envelope of the building. Data collected by EIA on the following specific building shell energy conservation features: roof, ceiling, or wall insulation; storm windows or double- or triple-paned glass (multiple glazing); tinted or reflective glass or shading films; exterior or interior shadings or awnings; and weather stripping or caulking. (See Roof or Ceiling Insulation, Wall Insulation, Reflective or Shading Glass or Film, Storm Window or Triple-Paned Glass, Building Shell (Envelope), and Weather Stripping or Caulking.)
    FK Reading Ease
    25.1

    FK Grade Level
    Graduate School
  • Flag
  • Capital cost: The cost of field development and plant construction and the equipment required for industry operations.
    FK Reading Ease
    30.3

    FK Grade Level
    College
  • Flag
  • Clinker: Powdered cement, produced by heating a properly proportioned mixture of finely ground raw materials (calciumcarbonate, silica, alumina, and iron oxide) in a kiln to a temperature of about 2,700 degrees Fahrenheit.
    FK Reading Ease
    9.3

    FK Grade Level
    Graduate School
  • Flag
  • Bridge project. A bridge project shall include any project where the primary purpose is to construct, reconstruct, rehabilitate, resurface, or restore a bridge.

    FK Reading Ease
    44.4

    FK Grade Level
    High School
  • Flag
  • Percentage of completion method refers to a system under which payments are made for construction work according to the percentage of completion of the work, rather than to the grantee's cost incurred.
    FK Reading Ease
    36.9

    FK Grade Level
    Graduate School
  • Flag